Skip to main content
WARNING! From February 2022, these pages are no longer maintained.
Please see the current Duet3D documentation at https://docs.duet3d.com/

Changes to Step #19

Edit by Jason Znack

Edit approved by Jason Znack

Before
After
Unchanged

Step Lines

+[title] Connecting to the DWC
+[* black] The final step is to test the network connection to the Duet Maestro and the Duet Web Control.
+[* black] Disconnect the USB cable, apply direct power from the PSU.
+[* black] Enter the IP address we obtained from the last step into your browser address bar, which should load the Duet Web Control interface.
+[* black] Now we can continue on with first commissioning of the printer in the next guide.

Image 1

No previous image

Added